Surefoot S600 Pile Cap

16 Piles (not included)
Typical install time 40 mins
Suitable for APAC AL-Series Towers

Surefoot's largest model is designed to take higher loads and is used mainly in the commercial and renewable energy sector. The recommended maximum capacity is 300 kN. It has an average installation time of 40 minutes.

The S600 – 16 pile model can be used on its own or in combination to negate higher bending moment loads.

Bolting Pattern:

  • 350-400 PCD x 4 x 26mm holes
  • 432-500 PCD x 4 x 32mm holes

Required Micro Piles:

  • 16 x 32NB (Nominal Bore) 42.4OD
Part Code
S600

Specifications

Physical Specification

Materials
Steel
Mounting
32NB / 42OD Pile
Dimensions
708 × 708 × 70 mm
Weight
40.64 kg

Interfaces

Installation / Attachment

Quantity Mounting Notes
16
32NB / 42OD Pile
Multiple Pile Lengths Supported

Available Interfaces

Quantity Interfaces Notes
1
S600 Bolt Pattern

Subcomponents

Subcomponents

Quantity Item Materials Material Finish
1
S600 Assembly, Fully Welded
Steel
Hot-Dip Galvanised

Downloads & Media

Gallery

Image
pollution/dust monitoring, remote QLD on surefoot bases
Pollution/dust monitoring, remote QLD on Surefoot bases
Image
AL220 15m installed by Wi-Sky, connecting rural farms
AL220 15m installed by Wi-Sky, connecting rural farms
Image
Surefoot foundations for the freestanding AL340
Surefoot foundations for the freestanding AL340