Surefoot S600 Pile Cap
16 Piles (not included)
Typical install time 40 mins
Suitable for APAC AL-Series Towers
Surefoot's largest model is designed to take higher loads and is used mainly in the commercial and renewable energy sector. The recommended maximum capacity is 300 kN. It has an average installation time of 40 minutes.
The S600 – 16 pile model can be used on its own or in combination to negate higher bending moment loads.
Bolting Pattern:
- 350-400 PCD x 4 x 26mm holes
- 432-500 PCD x 4 x 32mm holes
Required Micro Piles:
- 16 x 32NB (Nominal Bore) 42.4OD
Part Code
S600
Specifications
Physical Specification
Materials
Steel
Mounting
32NB / 42OD Pile
Dimensions
708 × 708 × 70 mm
Weight
40.64 kg
Interfaces
Installation / Attachment
| Quantity | Mounting | Notes |
|---|---|---|
|
16
|
32NB / 42OD Pile
|
Multiple Pile Lengths Supported
|
Available Interfaces
| Quantity | Interfaces | Notes |
|---|---|---|
|
1
|
S600 Bolt Pattern
|
Subcomponents
Subcomponents
| Quantity | Item | Materials | Material Finish |
|---|---|---|---|
|
1
|
S600 Assembly, Fully Welded
|
Steel
|
Hot-Dip Galvanised
|
Downloads & Media
Document
Surefoot_Installation-Manual.pdf
(3.78 MB)
Document
SUREFOOT-BROCHURE-low-res-1.pdf
(3.12 MB)
Gallery
Image
Pollution/dust monitoring, remote QLD on Surefoot bases
Image
AL220 15m installed by Wi-Sky, connecting rural farms
Image
Surefoot foundations for the freestanding AL340