Surefoot S400 Pile Cap

12 Piles (not included)
Typical install time 40 mins
Suitable for APAC AL-Series Towers

Designed to take higher loads in the renewable energy, residential and commercial sector. The S400 – 12 pile model is also considered as our universal model as 8 ,10 or 12 micro piles could be specified by our engineering team to accommodate your requirements.

It can accommodate up to 200 kN of gravity load and has an average installation time of 35 – 45 minutes. With untapped potential within many industries including the military, this innovative, reliable footing system will continue to revolutionise the way the construction industry operates.

Bolting Pattern:

  • 198-250 PCD x 4 x 22mm holes
  • 300-350 PCD x 4 x 26mm holes 

Required Micro Piles: 

  • 6 x 32NB (Nominal Bore) 42.4OD (up to 12)
Part Code
S400

Specifications

Physical Specification

Materials
Steel
Mounting
32NB / 42OD Pile
Dimensions
445 × 445 × 70 mm
Weight
13.66 kg

Interfaces

Installation / Attachment

Quantity Mounting Notes
12
32NB / 42OD Pile
Multiple Pile Lengths Supported

Available Interfaces

Quantity Interfaces Notes
1
S400 Bolt Pattern

Subcomponents

Subcomponents

Quantity Item Materials Material Finish
1
S400 Assembly, Fully Welded
Steel
Hot-Dip Galvanised