Surefoot S400 Pile Cap
12 Piles (not included)
Typical install time 40 mins
Suitable for APAC AL-Series Towers
Designed to take higher loads in the renewable energy, residential and commercial sector. The S400 – 12 pile model is also considered as our universal model as 8 ,10 or 12 micro piles could be specified by our engineering team to accommodate your requirements.
It can accommodate up to 200 kN of gravity load and has an average installation time of 35 – 45 minutes. With untapped potential within many industries including the military, this innovative, reliable footing system will continue to revolutionise the way the construction industry operates.
Bolting Pattern:
- 198-250 PCD x 4 x 22mm holes
- 300-350 PCD x 4 x 26mm holes
Required Micro Piles:
- 6 x 32NB (Nominal Bore) 42.4OD (up to 12)
Part Code
S400
Specifications
Physical Specification
Materials
Steel
Mounting
32NB / 42OD Pile
Dimensions
445 × 445 × 70 mm
Weight
13.66 kg
Interfaces
Installation / Attachment
| Quantity | Mounting | Notes |
|---|---|---|
|
12
|
32NB / 42OD Pile
|
Multiple Pile Lengths Supported
|
Available Interfaces
| Quantity | Interfaces | Notes |
|---|---|---|
|
1
|
S400 Bolt Pattern
|
Subcomponents
Subcomponents
| Quantity | Item | Materials | Material Finish |
|---|---|---|---|
|
1
|
S400 Assembly, Fully Welded
|
Steel
|
Hot-Dip Galvanised
|
Gallery
Image
AL220 15m installed by Wi-Sky, connecting rural farms